At 17:37 on September 28, 2021, the meteorological bureau of Yiling District issued an orange rainstorm warning. Large areas of water accumulated in many areas of Yiling District, making it impossible for vehicles to pass. General Manager Li Rende quickly launched the flood control emergency plan, notified the workshop staff on duty to immediately strengthen the inspection, and the workshop staff responded positively.
Chen Shilong, a fitter in Workshop 2, and Zhao Xuemei, a synthesiser, found that the rainstorm caused serious water leakage in three places near the roof guide channel of the workshop during the inspection. They quickly handled the flood situation and reported it in time. After receiving the flood situation, the Safety Department quickly organized personnel to assist Workshop II in the rescue task. The emergency water pump, water pipe, flashlight, mobile cable and other materials prepared in the emergency plan immediately played a role. After nearly an hour of effort, all the water in the four machine pits was pumped out. During the rescue, General Manager Li Rende paid close attention to the safety of personnel and equipment, and did not relax his vigilance until the end of the rescue, and asked the night shift personnel to strengthen inspection.
As the flood control plan of Zhongjing Company is in place, the flood control materials are fully prepared, the flood control drill is implemented, and the emergency response personnel handle it properly. No personnel and equipment safety accidents occurred during the storm rescue. It inspected the emergency response capability of Zhongjing Company, reflecting the necessity of emergency drill.
Cao Guobin, the First Party Branch of Zhongjing
September 29, 2021